Projects.

Project: 2nd Presbyterian Church.

Feb 2026 – Mar 2026.

Challenge: Drop Arch Frame for Security Glass Guarding the Restored 134-Year-Old Tiffany Jeweled Window Fabrication. Non-standard angles + high wind load.

Solution: Customized bend aluminum framing + Tailored connections.

Result: Durable, modern, custom safety glass armature with clean geometry.

Thumbnail for https://abc7chicago.com/post/work-begins-restore-window-designed-louis-comfort-tiffany-donated-marshall-field-family-second-presbyterian-church/16081689

https://abc7chicago.com/post/work-begins-restore-window-designed-louis-comfort-tiffany-donated-marshall-field-family-second-presbyterian-church/16081689


Project: Joliet Prison Chapel Historical Security Window.

Feb 2025 – Mar 2025

Challenge: Colossal Triangular Chapel Glass Armature Historical Security Window.

Solution: Structural retrofitting aimed at eliminating steel-loaded vertical members.

Result: Stabilizing the historical window assembly while safeguarding its structural stability.

Thumbnail for Joliet Prison Chapel

Joliet Prison Chapel

Tailored Water Diversion to Compression Configuration.

Thumbnail for One wonderful way to pluck the chicken.

3D Printed Visual Mockup Fabrication.

Nov 2024 – Dec 2024

Challenge: Electrochromic and photovoltaic glazing operations incorporated to the visual mockup composed of fabricated 3D printed profiles.

Solution: Tailored machining and modification of a rigid 3D-profile, which exhibited high susceptibility to breakage and cracking during cutting, drilling and notching.

Result: Transforming a 3D profile into a visual mock-up.

Thumbnail for 3D bead structure image.

3D bead structure image.